STRUCTURE, FUNCTION, & MAINTENANCE STANDARD TRAVEL PPC VALVE 12 OPERATION 1) At neutral Ports A and B of the control valve and ports P1 and P2 of the PPC valve are connected to drain chamber D through fine control hole f in spool (1). (Fig. 1) 2) Fine control (neutral fine control) When piston (4) starts to be pushed by disc (5), retainer (9) is pushed. Spool (1) is also pushed by metering spring (2), and moves down. When this happens, fine control hole f is shut off from drain chamber D . At almost the same time, it is connected to pump pressure chamber PP , and the pilot pressure of the main pump is sent from port A through fine control hole f to port P1.
When the pressure at port P1 rises, spool (1) is pushed back. Fine control hole f is shut off from pump pressure chamber PP . At almost the same time, it is connected to drain chamber D, so the pressure at port P1 escapes. As a result, spool (1) moves up and down until the force of metering spool (2) is balanced with the pressure at port P1 . The relationship of the position of spool (1) and body (10) (fine control hole f is in the middle between drain hole D and pump pressure chamber PP ) does not change until retainer (9) contacts spool (1).
Therefore, metering spring (2) is compressed in proportion to the travel of the control lever, so the pressure at port P1 also rises in proportion to the travel of the control lever. In this way, the spool of the control valve spool moves to a position where the pressure of chamber A (same as pressure at port P1 ) and the force of the return spring of the control valve spool are balanced. (Fig. 2) PC210/240-7K 10-123