DISASSEMBLY AND ASSEMBLY CONTROL VALVE ASSEMBLY 12 REMOVAL AND INSTALLATION OF ASSEMBLY CONTROL VALVE ASSEM- BLY REMOVAL (9): Swing LS separator valve hose (10): Left swing hose (Hose band, red) (11): Travel right front and reverse hose (Hose band, blue) (12): Arm dump hose (Hose band, yellow) Lower the work equipment to the ground for safety and stop the engine. Unscrew the oil filler cap on the hydraulic tank slowly to release pressure inside the tank. Then move the safety lock lever to the LOCK position. Attach an identification tag to each piping to avoid a mistake in the position of installation later. 1. Open up engine hood (1). 2. Remove control valve upper cover (2). 5.
Disconnect the seven PPC hoses at right. (13): PPC hoses from the top to bottom Bucket digging (Hose band, white) Travel left front and reverse (Hose band, red) Boom lower (Hose band, brown) Right swing Travel right front (Hose band, green) Arm digging (Hose band, blue) (14): Divide/merge valve hose (Hose band, yel- low blue) 3. Remove engine partition cover (3) and control valve partition cover (4). 4. Disconnect the eight PPC hoses at left. (5): Relief valve hose (6): Bucket dump hose (Hose band, black) (7): Travel left front and reverse hose (8): Boom raise hose (Hose band, green) PC210/240-7K 30-69