DISASSEMBLY AND ASSEMBLY CONTROL VALVE ASSEMBLY 12 (21): From top to bottom B1 port hose (Bucket bottom side) B2 port hose (Swivel joint A port) B3 port tube (Boom head side) B4 port hose (Swing motor MB port) B5 port hose (Swivel joint B port) B6 port hose (Arm bottom side) (22): Drain hose (TS port) 6. Disconnect four boom hoses (15). 7. Remove boom tube mounting clamps (16) and (17). 9. Disconnect hose (23) between the control valve and the swing motor as well as hose (24) between the con- trol valve and the solenoid. 8. Disconnect the 13 control valve hoses and two tubes. (18): PLS1 Hose (19): PLS2 hose (hose band, red) (20):
From top to bottom A1 Port hose (Bucket head side) A2 Port hose (Swivel joint B port) A3 port tube (Boom bottom side) A4 port hose (Swing motor MA port) A5 port hose (Swivel joint C port) A6 port hose (Arm head side) 30-70 PC210/240-7K