Komatsu — WORK EQUIPMENT PPC VALVE ASSEMBLY

DISASSEMBLY AND ASSEMBLY WORK EQUIPMENT PPC VALVE ASSEMBLY 12 DISASSEMBLY AND ASSEMBLY OF VALVE ASSEMBLY WORK EQUIPMENT PPC VALVE ASSEMBLY This section deals with only precautions to be fol- lowed when reassembling the PPC valve assembly for work equipment. When assembling piston (8), coat the piston outer periphery and body hole inner periphery with grease. Plate (5) mounting bolt: 11.8 - 14.7 Nm (1.2 -1.5 kgm) Joint (4) sliding surface: Grease 2 - 4 cc (G2-LI) Body female screw portion: Adhesive compound (LT-2) Coat the female screw body with Loctite at two spots as shown in the diagram below. Each spot is to be coated with a drop (approx. 0.02 g). Joint (4):

39 - 49 Nm (4 - 5 kgm) Strictly follow the specified torque for the joint. ASSEMBLY Reassembling work equipment PPC valve reassembly Install spring (11) so that the end surface of smaller end coil diameter (inner diameter) will face the shim (12) side. Springs (10) in use differ in the number of turns according to hydraulic ports as classified in the table below. Hence take care when installing one. Contact surfaces of piston and disc (2): Grease 0.3 - 0.8 cc (G2-LI) Nut (1): 98 - 127 Nm (10 - 13 kgm) After assembling the disc, refer to the Adjustment of Work Equipment and Swing PPC Valve section of the TESTING AND ADJUSTING chapter of this man- ual.

Port location Spring free length P1, P2 44.4 mm The location of each port is stamped in the lower part of the valve body. P3, P4 42.4 mm Piston (8): Grease (G2-LI) PC210/240-7K 30-79