. MAINTENANCE SERVICE PROCEDURE EVERY 250 HOURS SERVICE (3) Blade arm ball joint (3 places) (4) Brace screw (2 places) 4 - 48 LUBRICATIN 1. Lower th e work equipme nt to the ground, then stop the engine. 2. Using a grease pump, p ump in grease through the grease 3. After gr easing, wipe off any old grease tha t was pushed out.
(1) Blade lift cylinder suppor (2) Blade lift cylinder suppor (5) Ripper ti lt cylinder bottom pin (2 places) (6) Ripper li ft cylinder bottom pin (2 places) (7) Ripper ti lt cylinder rod en d pin (2 places (8) Ripper li ft cylinder rod en d pin (2 places (9) Ripper a rm pin (front) (2 (10 ) Ripper arm pin (rear) (2 The sketch on the right show s the giant ripper (option).