Komatsu — EVERY 250 HOURS SERVICE

. MAINTENANCE SERVICE PROCEDURE MAINTENANCE SERVICE PROCEDURE CHECK, ADJUST ALTERNATOR DRIVE BELT TENSION 4 - 49 (11 ) Equalize r ba r sid e shaft ( 2 places) (12 ) Suspension (Equalizer b ar center shaft) (1 place) 1) C arry out greasin g o f the suspension (e qualizer bar center s haft) t hrough the grease fi ttings marked b y arrows . 2) P ump t he greasing lever u p and down 3 to 5 times. Fan pulle y (1 INSPECTIO N Press the bel t wit h a t humb m idway between the alternator pulley and drive pulley. The followin g are the stand ard deflections. When replacing w ith n ew belt: 19 - 2 1 mm (0.7 - 0.8 in) (approx . 10 kg) When adjusting t ension: 24 - 26 mm (0.9 - 1. 0 in) (approx. 10 kg)