John Deere 450DLC, 650DLC, and 850DLC Excavators — Installing Boom

Miscellaneous—Machine Assembly Installing Boom CAUTION: Do Not allow anyone to enter the area under a lifted boom. 1. Attach cable or chain ends to the brackets, as illustrated. Lift the boom using a crane. T122534 –UN–05AUG99 2. Pull out the boom to main frame pin (C) until the end of the pin is flush with the inside end of the right side bracket. 450DLC—Specification Boom Pivot Pin—Weight 116 kg approximate ............................................ 257 lb approximate 650DLC—Specification Boom Pivot Pin—Weight 156 kg approximate ............................................

345 lb approximate 850DLC—Specification Boom Pivot Pin—Weight 193 kg approximate ............................................ 425 lb approximate T122535 –UN–05AUG99 3. Apply a film of grease to pin. 4. Lift up boom (A) with a crane. 450DLC—Specification Boom And Arm Cylinder—Weight 3370 kg approximate ............................ 7430 lb approximate 650DLC—Specification Boom And Arm Cylinder—Weight 5250 kg approximate ............................ 11,600 lb approximate T122537 –UN–05AUG99 850DLC—Specification Boom And Arm Cylinder—Weight 8200 kg approximate ............................

18,100 lb approximate A—Boom B—Cable Or Chain C—Boom-To-Main Frame Pin Continued on next page DW90712,0000077 –19–03MAR06–1/3 4-5-7 010609 PN=250