John Deere 700H Crawler Dozer — Disassemble and Assemble to Turn Pins and Bushings and Not Lubricate

Track System IMPORTANT: Pins must be installed so cross-drilled hole is toward link wear surface or they may break when chain is used. 20. Turn pin end-for-end to get a new wear surface, then install it into bushing so cross-drilled hole (B) is toward link wear surface. Install all pins so hole (A) in end of pin is toward the same side of chain, either left or right side. T96277 –UN–27OCT88 A—Pin End Hole B—Cross-Drilled Hole Continued on next page CED,TX03399,5954 –19–24MAR00–8/11 TM1859 (14JUL04) 01-0130-49 700H Crawler Dozer 071404 PN=99 18. Adjust track press pressure relief valve setting. Specification Track Press Relief Valve—Force..................

378 080 N (85,000 lb force) Maximum 19. Advance rams to press split links together until the correct bolt spacing is obtained for the master shoe. –UN–27OCT88 T96274 CED,TX03399,5954 –19–24MAR00–7/11 01 0130 49