Track System TM1859 (14JUL04) 01-0130-57 700H Crawler Dozer 071404 PN=107 1—Left Hand Bracket 9—Bottom Wear Plate 17—Washer (8 used) 25—Bracket 2—Idler 10—Washer (8 used) 18—Cap Screw (8 used) 26—Spring Locking Pin (4 3—Shaft 11—Cap Screw (8 used) 19—Piston used) 4—O-Ring (2 used) 12—Side Wear Plate (2 used) 20—Wiper Seal 27—Right Hand Bracket 5—Bushing (2 used) 13—Cap Screw (8 used) 21—Seal 28—Bracket and Idler Shaft 6—Metal Face Seal (2 used) 14—Shim (as required) 22—Yoke with Tube Assembly 7—Shim (as required) 15—Nut (8 used) 23—Check Valve with Nut 8—Top Wear Plate 16—Cap Screw (8 used) 24—Grease Fitting and Check Valve 1. Remove cap screws and washers (13) to remove 7.
Apply clean hydraulic oil to bushings (5). side wear plates (12) and shims (7). 8. Inspect metal face seals. (See Inspect Metal Face 2. Remove cap screws (11) and wear plate (9). Seals in this group.) 3. Drive pins (26) out. 9. Install new metal face seals (6), if necessary. IMPORTANT: Keep metal face seals (6) lubricated 10. Install shaft (3), O-rings (4), and brackets (1 and and together at all times while 27). disassembled. 11. Drive in spring pins (26). 4. Remove brackets (1 and 27), O-rings (4) and metal face seals (6). 12. Install wear plate (9), side wear plates (12) and shims (7). 5. Remove shaft (3) and inspect bushings (5). Replace if necessary. 13. Adjust front Idler.
(See Front Idler Adjustment Procedure in this group.) 6. Install new bushings. Drive in bushings until bottomed. 14. Fill idler with oil. (See Check Front Idler Oil Level in this group.) IMPORTANT: Lubricate idler bushings with oil before installing shaft. CED,TX03399,5958 –19–24MAR00–2/2 01 0130 57