John Deere 700H Crawler Dozer — Disassemble and Assemble

Track System 7. Install spring, spring retainer plates and cap screws. Tighten spring retainer plate cap screws. 8. Install cover. 01 0130 64 9. Install front idler. Slide hydraulic track tension adjuster back, aligning spring housing with piston. (See Remove and Install Front idler in this group.) CED,TX03399,6112 –19–16JUN00–2/2 Disassemble and Assemble Track Idler Recoil Spring CAUTION: Spring or rod may break if dropped while handling, transporting or disassembling. Nicks or weld craters in spring and rod assembly can cause stress concentration resulting in a weak spot that may result in immediate or eventual failure creating a risk of personal injury.

Put a heavy protective covering around spring assembly when handling, transporting or disassembling. A compression tool must be used for disassembly and assembly because of the extreme preload on spring. 1. Use ST4920 Track Recoil Spring Disassembly and Assembly Tool (A) with a 20-ton jack placed under tool. (See Section 99 for instructions to make tool.) T6557DY –UN–25OCT88 Remove nuts (B) and top plate (C). 2. Put recoil spring in compression tool. Track Recoil Spring—Specification Recoil Spring—Free Length 582 mm (22.9 in.) Approximate .....................

A—ST4920 Compression Tool B—Nut (4 used) C—Top Plate Continued on next page CED,TX03399,5963 –19–10NOV00–1/4 TM1859 (14JUL04) 01-0130-64 700H Crawler Dozer 071404 PN=114