John Deere 700H Crawler Dozer — Remove and Install

Remove and Install Track Frame Track System 1. Raise crawler using a 9072 kg (10 ton) floor jacks and support machine using shop stands. Machine must be high enough so track rock guards will clear chain when removed. 01 0130 68 2. Disconnect track chain. (See Remove and Install Lubricated Track Chain in this group.) 3. Remove two sprocket segments. (See Remove and Install Sprocket Segment in this group.) CAUTION: The approximate weight of track frame is 968 kg (2 134 lb). 4. Connect a chain and hoist to track frame. CED,TX03399,5964 –19–14NOV03–1/3 5. Remove pivot cover (2). 6. Remove retainers (1). 7. Remove pivot shaft cover and disconnect lube line. 8. Remove crossbar pin.

T131868B –UN–19JUN00 9. Carefully remove track frame.(See Remove and Install Track Frame in this group.) 10. Install track frame. (See Remove and Install Track Frame in this group.) 11. Connect lube line and crossbar pin. 1—Cover 2—Retainer (2 used) 12. Install retainers. Clean cap and mating surfaces. Install plastic gasket to cap. 13. Install pivot shaft cover. Tighten to specifications. Remove and Install Track Frame—Specification Pivot Shaft Cover Cap Screws— Torque 675 (500 lb-ft) ......................................................................... TM1859 (14JUL04) 01-0130-68 700H Crawler Dozer Continued on next page CED,TX03399,5964 –19–14NOV03–2/3 071404 PN=118