Hydrostatic System 4. Remove socket head cap screws (A) and retaining plate (B). NOTE: The bearings on shaft (D) are slip fit in the housing bore. 5. Remove seal carrier (C) and shaft (D) with bearings. Lightly tap on opposite end of shaft to aid in removal. RW25727 –UN–09JUN97 A—Socket Head Cap Screw (3 used) B—Retaining Plate C—Seal Carrier D—Shaft 03 0360 8 CED,OUTX547,110 –19–28JUN02–2/22 6. Inspect bearing assembly (B). 7. Remove retaining ring (A) and remove outer bearing assembly (B) from inner bearing race. 8. Remove inner bearing race from shaft using a press. RW25728 –UN–11JUN97 9. Install new inner bearing race onto shaft using a press. 10.
Install new outer bearing assembly (B) and retaining ring (A) onto shaft. IMPORTANT: Cover shaft splines with shim stock to protect lip seal. A—Retaining Ring B—Bearing Assembly C—Lip Seal D—O-Ring 11. Wrap the spline or key end of shaft with thin plastic (shim stock) to prevent damage to the shaft seal lip during installation. Lubricate the inside diameter of the new seal with petroleum jelly. Install new shaft lip seal (C) in seal carrier with spring side of seal toward pump housing. 12. Install O-ring (D) on seal carrier. 13. Rotate pump 180 ° . TM1859 (14JUL04) 03-0360-8 700H Crawler Dozer Continued on next page CED,OUTX547,110 –19–28JUN02–3/22 071404 PN=198