Hydrostatic System Disassemble and Assemble Hydrostatic Charge Pump IMPORTANT: Absolute cleanliness is essential when working on hydrostatic components. 1. Remove socket head cap screws (A), adapter (B) and O-ring. T118269B –UN–20NOV98 A—Socket Head Cap Screw (4 used) B—Adaptor Plate CED,OUO1008,146 –19–13APR99–1/10 2. Remove cap screws (C) and retaining plate (D).
C—Cap Screw (6 used) D—Retaining Plate T118256B –UN–20NOV98 TM1859 (14JUL04) 03-0360-19 700H Crawler Dozer Continued on next page CED,OUO1008,146 –19–13APR99–2/10 071404 PN=209 1—O-Ring 3—Flange Adapter 17—O-Ring 28—O-Ring 2—Socket Head Cap Screw (4 4—O-Ring 18—Charge Relief Valve 29—Gasket used) 5—Retaining Plate Housing 30—Orifice 6—Cap Screw (6 used) 19—Charge Relief Poppet 31—Nut 7—Charge Pump Cover 20—Spring 32—O-Ring 8—Bushing 21—Adjustment Screw 33—Nut 9—Coupling 22—Orifice 34—O-Ring 10—Manifold 23—Pump Displacement 35—Charge Pump 11—Nut Control Valve Housing/End Cap 12—O-Ring 24—Socket Head Cap Screw (6 36—Bushing 13—Tube used) 37—Charge Pump Shaft 14—Socket Head Cap Screw (2 25—O-Ring (3 used) 38—Alignment Pin used) 26—Electronic Displacement 39—Port Plate1 15—Multi-Function Valve (2 Control (EDC) 40—Charge Pump Gear Set1 used) 27—Socket Head Cap Screws 41—Key 16—O-Ring (4 used) 1Serviced as an assembly.
CED,OUO1008,147 –19–17DEC98–2/2 03 0360 19