Hydrostatic System IMPORTANT: Wear patterns develop between pump gerotor assembly (E) and eccentric ring (F). Components must be installed in proper position with original orientation. 3. Tag or identify visible side of pump gerotor assembly (E) and eccentric ring (F) to aid in proper assembly. RW25723 –UN–23JUN97 4. Remove and inspect parts (A—H) and replace as required. 5. Remove bushing from charge pump cover (A). 6. Clean all parts and lightly apply clean hydraulic oil.
A—Charge Pump Cover B—Auxiliary Drive Coupling C—Charge Pump Shaft D—Key E—Charge Pump Gerotor Assembly 1 03 0360 20 F—Eccentric Ring 1 G—Alignment Pin H—Port Plate 1 Serviced as an assembly CED,OUO1008,146 –19–13APR99–3/10 IMPORTANT: Charge pump rotation is determined by the orientation of eccentric ring in the gerotor assembly, and the location of the alignment pin (A). Incorrect assembly will not provide charge oil to the pump and will result in damage to the pump. NOTE: One of the large socket head cap screws and four washers must be installed in the end cap, as illustrated, before assembling the charge pump. T118257B –UN–20NOV98 7.
Install charge pump alignment pin (A) in the right rotation hole as illustrated. 8. Install port plate (B). A—Alignment Pin B—Port Plate TM1859 (14JUL04) 03-0360-20 700H Crawler Dozer Continued on next page CED,OUO1008,146 –19–13APR99–4/10 071404 PN=210