John Deere 700H Crawler Dozer — Charge Pump, Disassemble and Assemble

Hydrostatic System 13. Install bushing in charge pump cover. 14. Install charge pump cover (2) making sure hole (1) in cover aligns correctly with alignment pin (3). 1—Hole in Cover 2—Charge Pump Cover 3—Alignment Pin T119172B –UN–07JAN99 03 0360 22 CED,OUO1008,146 –19–13APR99–8/10 15. Install retaining plate (1) and cap screws (2). Tighten to specifications. Hydrostatic Pump—Specification Charge Pump Retaining Plate Cap Screws—Torque 14 (120 lb-in.) ................................................... T119594B –UN–22JAN99 16. Lubricate O-ring (4) with petroleum jelly and install. 17. Remove socket head cap screw and washers (3).

1—Retaining Plate 2—Cap Screw (6 used) 3—Socket Head Cap Screw and Washers 4—O-Ring Continued on next page CED,OUO1008,146 –19–13APR99–9/10 TM1859 (14JUL04) 03-0360-22 700H Crawler Dozer 071404 PN=212