John Deere 700H Crawler Dozer — Assemble

Hydrostatic System 31. Install JDG1094 Leveling Plate (A) to pump housing making sure spring pockets (B) are correctly aligned with springs (C). 32. Install and tighten cap screws (D). RW25760 –UN–16JUN97 RW25761 –UN–16JUN97 A—JDG1094 Leveling Plate B—Spring Pocket (3 used) C—Leveling Spring (3 used) D—Cap Screw (2 used) RX16216015,17A –19–28JUN02–8/15 IMPORTANT: The base of the depth micrometer must be positioned on top of the JDG1094 Leveling Plate when measuring zero angle position of the swashplate. 03 0360 34 The rod must be located on the swashplate and NOT on the piston retainer plate. RW25762 –UN–16JUN97 NOTE:

Depth gauge must have capability of measuring approximately 100—127 mm (4—5 in.). 33. Measure the zero angle position of the swashplate using a depth micrometer as illustrated making sure the end of the micrometer rod (A) is contacting the swashplate flat surface (B). A—Depth Micrometer B—Swashplate Flat Surface C—Opposite Measuring Location 34. Measure the other side of swashplate at (C). IMPORTANT: Measurements must not vary more than 0.025 mm (0.001 in.) on either side of the swashplate. 35. Take a second measurement on each side. Continued on next page RX16216015,17A –19–28JUN02–9/15 TM1859 (14JUL04) 03-0360-34 700H Crawler Dozer 071404 PN=224