Hydrostatic System 41. Install two alignment pins (A). 42. Lubricate the running surface of the cylinder block. NOTE: Make sure valve plate (B) and gasket (D) do not get caught on alignment pins (A) during installation. T156793B –UN–27JUN02 NOTE: The arrow cut-outs in the valve plate must point in the direction of pump rotation when viewed from the shaft end. 43. Install valve plate (B) making sure the direction arrows (C) stamped in the valve plate are correctly positioned. A—Alignment Pin (2 used) B—Valve Plate C—Directional Arrow (2 used) D—Gasket 44. Install gasket (D).
Continued on next page RX16216015,17A –19–28JUN02–11/15 TM1859 (14JUL04) 03-0360-35 700H Crawler Dozer 071404 PN=225 36. Rotate the side cover at location (D) as necessary to obtain zero angle position of swashplate. 37. Once zero angle position has been established. Tighten the two side cover screws (E) to specifications. –UN–17NOV98 Hydrostatic Pump—Specification Side Cover-to-Pump Housing Blind Hole Cap Screws—Torque.................................... 33 N•m (24 lb-ft) T118274 38. Install the remaining new four side cover cap screws to specifications.
Hydrostatic Pump—Specification D—Side Cover Rotation Side Cover-to-Pump Housing E—Cap Screw (4 used) Through (Top Two) Hole Cap Screws—Torque.............................................................. 33 N•m (24 lb-ft) 39. Recheck zero angle position to verify side cover did not move while torquing the four side cover cap screws (E). 40. Remove leveling plate. RX16216015,17A –19–28JUN02–10/15 03 0360 35