John Deere 700H Crawler Dozer — Assemble

Hydrostatic System IMPORTANT: Use hardened swashplate leveler spring shims only. Using other materials for shims may result in damage to pump. 45. Install the leveler spring shims (A) in the end cap pockets using petroleum jelly to hold shims. RW25765 –UN–20JUN97 46. Lubricate the end cap journal bearing (B) with clean hydraulic oil. A—Leveler Spring Shim (2 used) B—End Cap Journal Bearing 03 0360 36 RX16216015,17A –19–28JUN02–12/15 47. Install the end cap to the pump housing making sure springs align with the end cap pockets. 48. Install O-ring and adapter (1) on end cap. 49. Install four washers and socket head cap screws (2). Tighten cap screws to specifications.

Hydrostatic Pump—Specification End Cap/Adapter-to-Pump Cap Screws (Large)—Torque 298 (220 lb-ft) ............................................. T119614B –UN–15JAN99 50. Install socket head cap screw (3) with spacer and lifting bracket and cap screw (4). Tighten to specifications. 1—Adapter Plate 2—Socket Head Cap Screws (4 used) 3—Socket Head Cap Screw with Spacer and Lift Bracket 4—Socket Head Cap Screw Hydrostatic Pump—Specification End Cap-to-Pump Cap Screws (Small)—Torque 33 (24 lb-ft) .............................................................. Continued on next page RX16216015,17A –19–28JUN02–13/15 TM1859 (14JUL04) 03-0360-36 700H Crawler Dozer 071404 PN=226