John Deere 700H Crawler Dozer — Assemble

Hydrostatic System 51. Turn the pump 180 ° to install the shaft. 52. Install the shaft and bearing assembly. 53. Rotate the shaft to insure the rotating assembly turns freely. RW25767 –UN–20JUN97 RX16216015,17A –19–28JUN02–14/15 TM1859 (14JUL04) 03-0360-37 700H Crawler Dozer 071404 PN=227 54. Carefully install seal carrier (A) with lip seal. 55. Install retaining plate (B) and socket head cap screws (C). Tighten to specifications. Hydrostatic Pump—Specification Input Shaft Seal Carrier Retaining –UN–20JUN97 Cap Screw—Torque..................................................... 16 N•m (144 lb-in.) 56. Install displacement control valve assembly.

(See Disassemble and Assemble Displacement Control RW25768 Valve in this group.) 57. Install speed sensor (front pump only). A—Seal Carrier B—Retaining Plate C—Socket Head Cap Screw (3 used) RX16216015,17A –19–28JUN02–15/15 03 0360 37