John Deere 700H Crawler Dozer — Disassemble

Hydrostatic System TM1859 (14JUL04) 03-0360-45 700H Crawler Dozer 071404 PN=235 –UN–07FEB96 T100265 1—Lock Nut 4—O-Ring 7—Setting Lug 10—Spring Guide 2—Nut 5—Glide Ring 8—Cone Point Set Screw 11—Spring Guide 3—Shaft 6—Servo Piston 9—Lock Screw 12—O-Ring 17. Remove shaft (3) with lock nut (1) as an 22. Install the cone point set screw (8) so that the assembly. Replace O-ring (4). point enters the groove of the setting lug. DO NOT tighten set screw at this time. 18. Remove lock screw (9) and cone point set screw (8) from servo piston (6). NOTE: If shaft with adjusting nut was disassembled, it MUST be adjusted when end cap is 19.

Remove setting lug (7) and servo piston from end completely assembled. Loosen lock nut (1) cap. Inspect glide ring (5) for wear or damage and and adjust shaft (3) by turning internal hex on replace if necessary. end of shaft clockwise until shaft bottoms. Turn shaft counterclockwise four turns and tighten 20. Carefully install a new O-ring (12) and a new glide lock nut. ring (5) on the servo piston (6). Lubricate the glide ring with clean hydrostatic oil and install the servo 23. Install shaft with adjusting nut through setting lug piston into the end cap. and spring guide. Tighten to specifications. 21. Install the setting lug (7) into the servo piston from Specification inside the end cap.

The offset of the setting lug Shaft Adjusting Nut—Torque.................................... 20 N•m (15 lb-ft) must be located away from the control end of the end cap. Install spring guide (10) through setting lug. Continued on next page CED,TX03399,5991 –19–28JUN02–6/11 03 0360 45