John Deere 700H Crawler Dozer — Remove and Install Hydrostatic Reservoir

Remove and Install Hydrostatic Reservoir Hydrostatic System 1. Remove cab or ROPS. (See Remove Cab or ROPS in Group 1800.) 2. Drain reservoir. The approximate capacity of hydrostatic reservoir is 65.1 L (17.2 gal). 3. Disconnect hose from hydrostatic filter. Close all openings using caps and plugs. 4. Disconnect wiring lead on top of filter. 5. Loosen cap screws on filter and slide through slot to remove filter. 03 0360 6. Remove 24 volt power converter, cover and resisters. 66 7. Disconnect cables and remove batteries. 8. Disconnect battery shutoff cable. 9. Remove inlet and return hoses from tank. 10.

Remove necessary tie bands and route transmission wiring harness and hoses through reservoir frame. CAUTION: The approximate weight of hydrostatic reservoir is 176 kg (388 lb). Hydrostatic Reservoir—Specification Reservoir—Weight 176 kg (388 lb) (Approximate) ...................................... 11. Install chain and hoist. 12. Remove cap screws and remove reservoir. Continued on next page CED,TX03399,6000 –19–05MAR04–1/3 TM1859 (14JUL04) 03-0360-66 700H Crawler Dozer 071404 PN=256