John Deere 700H Crawler Dozer — Remove and Install Hydrostatic Reservoir

Hydrostatic System TM1859 (14JUL04) 03-0360-67 700H Crawler Dozer 071404 PN=257 –UN–05JUN00 T130833 1—Plug 7—Door 15—Nut (11 used) (S.N. — 20—Plug 2—O-Ring 8—Latch 925917) 21—O-Ring 3—Reservoir (S.N. —925917) 9—Lock 16—Label 22—O-Ring Reservoir (S.N. 925918— ) 10—Label 17—Elbow (2 used) (S.N. — 23—Fitting (not shown) 11—Cap Screw (4 used) 925917) 24—Cap Screw (4 used) 4—Grommet 12—Washer (15 used) 18—Tube (S.N. —925917) 25—Washer (4 used) 5—Gasket (S.N. —925917) 13—Hinge (2 used) 19—Access Cover Plate 6—Decal 14—Cover Plate (S.N. — 925917) NOTE: Cleanout cover plate (14) shown in illustration Reservoir Cleanout Cover Cap applies to reservoirs (S.N. —925917). For Screw (S.N.

925918— )— Torque...................................................................................... 47 N•m cleanout cover repair procedure on machines 35 lb-ft (S.N. 925918— ) see Hydraulic and Hydrostatic Reservoir Cleanout Cover Remove 14. Route filter hoses and wiring harness through and Install (S.N. 925918— ). (Group 2160.) reservoir frame. Route all wiring harnesses back to their original location and replace all tie bands 13. Install reservoir and cap screws. that were removed. Hydrostatic Reservoir—Specification 15. Install filter and connect hydrostatic filter hoses Main Frame-to-Reservoir Cap and wiring lead.

Screws—Torque.................................................................... 319 N•m 235 lb-ft Reservoir Cleanout Cover Nuts 16. Install 24 volt power converter, cover and (S.N. —925917)—Torque........................................................ 30 N•m resisters. 22 lb-ft Continued on next page CED,TX03399,6000 –19–05MAR04–2/3 03 0360 67