John Deere 700H Crawler Dozer — Remove and Install

Removal and Installation 36. Connect engine wiring harness connector (17). 37. Install tee (18) and connect hoses (16 and 19). 38. Install floor plate. 16—Tee-to-Cooler Bypass Valve Hose 17—Engine Harness Connector 18—Front Pump Tee 19—Rear Pump-to-Front Pump Tee Hose T131179B –UN–24MAY00 TM1859 (14JUL04) 04-0400-9 700H Crawler Dozer Continued on next page CED,TX03399,6007 –19–15NOV00–14/20 071404 PN=271 31. If equipped with winch with a hydraulic pump with drive through shaft the flywheel will have a flywheel ring (3), cap screws (1) and washers (2). Apply thread lock and sealer (medium strength) to threads of cap screws (1). Tighten cap screws (1).

–UN–15FEB00 Engine—Specification Pump Flywheel Ring-to-Flywheel Housing Cap Screws—Torque........................................ 57 N•m (42 lb-ft) T128308 32. Install engine using side rail cap screws to guide engine in through slots aligning pump drive. 1—Cap Screw (8 used) 33. Install approximately four pump flywheel housing cap 2—Washer (8 used) screws before removing pump support. 3—Flywheel Ring 34. Remove pump support. 35. Install the remaining flywheel housing cap screws. Tighten cap screws. Engine —Specification Pump Flywheel Cover-to-Flywheel Housing Cap Screws—Torque..............................................................

73 N•m (54 lb-ft) CED,TX03399,6007 –19–15NOV00–13/20 04 0400 9