John Deere 700H Crawler Dozer — Remove and Install

Removal and Installation 39. Install compressor and tighten cap screws (13) (if equipped). 40. Install speed control bracket (15). Tighten cap screws. NOTE: Engine speed control linkage must be adjusted when bracket has been removed. T131173B –UN–24MAY00 41. Connect speed control linkage rod (14). 13—Compressor Cap Screws (4 used) (If Equipped) 14—Speed Control Linkage Rod 15—Speed Control Bracket CED,TX03399,6007 –19–15NOV00–15/20 04 0400 10 42. Connect battery ground cable (11) with ground strap. 43. Connect start solenoid positive cable (12).

11—Battery Ground Cable 12 —Start Solenoid Positive Cable T131170B –UN–24MAY00 Continued on next page CED,TX03399,6007 –19–15NOV00–16/20 TM1859 (14JUL04) 04-0400-10 700H Crawler Dozer 071404 PN=272