Removal and Installation 14. Install springs (3) and dowel pins (1). 15. Install park brake pressure plate (2) and hub. 1—Dowel Pins 2—Park Brake Pressure Plate 3—Springs (20 used) T133145B –UN–17AUG00 T133141B –UN–17AUG00 OUO1065,0000459 –19–15NOV00–3/5 16. Start with park brake disk and alternating install six disks and plates. T134060B –UN–27SEP00 11 1100 4 Continued on next page OUO1065,0000459 –19–15NOV00–4/5 TM1859 (14JUL04) 11-1100-4 700H Crawler Dozer 071404 PN=322