John Deere 700H Crawler Dozer — Remove and Install

Remove and Install Pivot Shafts Frame Installation 17 1740 1. Raise crawler using a 9072 kg (10 ton) floor jack and support machine using shop stands. Machine must be high enough to clear rock guards. 8 2. Disconnect track chain. (See Remove and Install Lubricated Track Chain in Group 0130.) 3. Remove two sprocket segments. 4. Remove track frame. (See Remove and Install Track Frame in Group 0130.) CED,TX03399,6032 –19–15NOV00–1/4 5. Remove sealing ring (4) and seal (5). Inspect bushings, with split in upward position, in pivot shaft housing. Replace if necessary. T131874 –UN–11JUL00 6. Install bushings flush with bore edge. 7.

Heat sealing ring (4) to 149 ° C (300 ° F) for approximately a half hour. Press sealing ring with chamfer towards direction of pivot shaft cap screws. 8. Install seal (5) with smaller diameter toward sealing ring. 1—Washer (14 used) 2—Cap Screw (14 used) 3—Shaft 4—Sealing Ring 5—Seal 6—Retainer (2 used) 7—Cap 8—Cap Screw (4 used) 9—Pipe Plug Continued on next page CED,TX03399,6032 –19–15NOV00–2/4 TM1859 (14JUL04) 17-1740-8 700H Crawler Dozer 071404 PN=390