Frame Installation 11. Install retainer (6). 12. Apply cure primer and formed-in-place gasket to cap (7). Install cap screws (8) and tighten. 13. Apply pipe sealant to threads of pipe plug (9). T131874 –UN–11JUL00 14. Install two sprocket segments. Apply thread lock and sealer (medium strength) to threads of cap screws.Tighten cap screws. Sprocket—Specification Sprocket Segment—Torque 258—312 (190—230 lb-ft) ..................... 1—Washer (14 used) 2—Cap Screw (14 used) 3—Shaft 4—Sealing Ring 5—Seal 6—Retainer (2 used) 7—Cap 8—Cap Screw (4 used) 9—Pipe Plug 15. Install track chain.
(See Remove and Install Lubricated Track Chain in Group 0130.) CED,TX03399,6032 –19–15NOV00–4/4 TM1859 (14JUL04) 17-1740-9 700H Crawler Dozer 071404 PN=391 IMPORTANT: Install cap screw (1) before install pivot shaft on frame. Cap screw (1) cannot be installed after installation of shaft. 9. Install cap screw (1) before installing shaft. Install pivot shaft and cap screws. Tighten cap screws. –UN–20JUN00 Pivot Shaft—Specification Pivot Shaft Cap Screws—Torque............................... 624 N•m (460 lb-ft) T131920B For cap screws which cannot be reach with torque wrench, use DFT1203 Torque Adapter.
(See DFT1203 Torque Adapter For Pivot Shaft in Section 99 for instructions to make tool.) 1—Cap Screw 10. Install track frame. (See Remove and Install Track Frame in Group 0130.) CED,TX03399,6032 –19–15NOV00–3/4 17 1740 9