John Deere 700H Crawler Dozer — Disassemble, Inspect and Assemble

Heating and Air Conditioning TM1859 (14JUL04) 18-1830-33 700H Crawler Dozer 071404 PN=477 10. Install a new gasket (C) flat side down and the rear housing (B) on the rear cylinder. Mount the compressor onto the holding fixture. 11. Install pins (T) and new O-ring (H) in the front cylinder. NOTE: The front valve plate is marked with an “F” and is installed face up. 12. Install parts (I—K) over the pins on the front cylinder. 13. Install a new gasket (L) flat side down. Put JDG746 lip seal protector on the shaft and lubricate with R134a oil. 14. Install the front housing (S) on the front cylinder and remove the lip seal protectors. Install through bolts (P) and new washers (O). 15.

Partially tighten the through bolts and then tighten to 26 N•m (19 lb-ft). Specification Air Conditioning Compressor Through Bolt—Torque..................................................26 N•m (230 lb-in.) 16. Install the felt (R) and felt holder (Q) using the clutch hub. 17. Install the pulley-clutch hub and check clearance. (See procedure in this group.) TX,18,RB764 –19–23APR99–3/3 18 1830 33