John Deere 700H Crawler Dozer — Remove and Install

Remove and Install Receiver-Dryer Heating and Air Conditioning NOTE: Anytime air conditioning system is discharged, a new receiver-dryer must be installed. 1. Remove left hand side cover. T118142B –UN–02NOV98 18 1830 2. Do recovery of the air conditioning system. (See procedure in this group.) 34 3. Disconnect hoses (1 and 3) and remove four cap screws (2) and remove receiver-dryer. 4. Install new receiver-dryer, and bracket. Tighten cap screws. 1—Receiver/Dryer Hose-to-Condenser 2—Receiver/Dryer Hose-from-Evaporator 3—Receiver/Dryer Bracket Cap Screw (4 used) 5. Apply refrigerant oil to new O-rings and immediately connect lines. 6. Add oil. (See R134a Component Oil Charge in this group.) 7.

Evacuate and charge the air conditioning system. (See procedure in this group.) CED,OUTX547,181 –19–16APR99–1/1 Remove and Install Evaporator or Heater Core NOTE: Anytime air conditioning system is discharged, a new receiver/dryer must be installed. 1. Remove cap screws to remove access cover to air conditioning and heater assembly. 2. Do recovery of the air conditioning system. (See procedure in this group.) TM1859 (14JUL04) 18-1830-34 700H Crawler Dozer Continued on next page CED,OUTX547,182 –19–16APR99–1/4 071404 PN=478