John Deere 700H Crawler Dozer — Remove and Install

Heating and Air Conditioning TM1859 (14JUL04) 18-1830-37 700H Crawler Dozer 071404 PN=481 Remove and Install Expansion Valve NOTE: Anytime air conditioning system is flushed or purged, a new receiver-dryer must be installed. 1. Open access cover. 7DEC98 2. Recover air conditioning system. (See R134a –UN–0 Refrigerant Recovery, Recycling and Charging Station Installation Procedure in this group.) T118238B 3. Disconnect (1 and 3). Close all openings using caps and plugs. 1—Expansion Valve Hose-to-Compressor 2—Cap Screw and Bracket 4. Remove cap screw and bracket (2). 3—Expansion Valve Hose-to-Receiver/Dryer 5. Remove two screws on expansion valve and remove valve. 6.

Install valve, bracket and connect hoses. 7. Install new receiver-dryer if system is purged or flushed. (See Remove and Install Receiver-Dryer in this group.) 8. Apply refrigerant oil to new O-rings and immediately connect lines. 9. Add oil. (See R134a Component Oil Charge in this group.) 10. Evacuate air conditioning system. (See Evacuate R134a System in this group.) 11. Charge the air conditioning system. (See Charge R134a System in this group.) CED,TX03399,5065 –19–16APR99–1/1 18 1830 37