Remove and Install Hydraulic Control Valve Hydraulic System 1. Lower all equipment to the ground and stop engine. CAUTION: To avoid injury from escaping fluid under pressure, stop engine and relieve the pressure in the system before disconnecting or connecting hydraulic or other lines. Tighten all connections before applying pressure. T132564B –UN–18JUL00 2. Operate control valves to release pressure in the hydraulic system. 3. Turn battery disconnect switch to OFF. 4. Apply a vacuum to hydraulic reservoir. 5. Disconnect linkage rods (1). 6. Mark and disconnect hoses (3—11). Close all openings using caps and plugs. T132565 –UN–20JUL00 7. Remove three cap screws (2) and control valve. 8.
Install control valve using three cap screws (2).
1—Control Valve Linkage (3 used) (4 used with Auxiliary Section Installed) 2—Cap Screw (3 used) 3—Hose—Lift Valve Section Top Port-to-Lift Cylinder Right and Left Rod End Port 4—Hose—Tilt Valve Section Top Port-to-Tilt Cylinder Rod End Port 5—Hose—Angle Valve Section Top Port-to-Right Angle Cylinder Rod End and Left Angle Cylinder Head End Port 6—Hose—Inlet Valve Cover Top Port-to-Hydraulic Oil Cooler Top Port 7—Hose—Inlet Valve Cover Bottom Port-to-Hydraulic Pump Bottom Port 8—Hose—Angle Valve Section Bottom Port-to-Left Angle Cylinder Rod End and Right Angle Cylinder Head End Ports 9—Hose—Tilt Valve Section Bottom Port-to-Tilt Cylinder Head End Port 10—Hose—Lift Valve Section Bottom Port-to-Lift Cylinder Right and Left Head End Ports 11—Hose—Outlet Valve Cover Bottom Port-to-Hydraulic Filter Port 9.
Connect lines (3—11). 32 3260 10. Connect linkage rods (1). 8 11. Remove vacuum from reservoir and check and fill reservoir as needed. 12. Turn battery disconnect switch to ON. 13. Start machine and check for leaks. TM1859 (14JUL04) 32-3260-8 700H Crawler Dozer CED,TX03399,6076 –19–30MAR00–1/1 071404 PN=560 3 11 T132565 (EVA100248) 1 4 5 6 7 8 0 9