John Deere 700H Crawler Dozer — Disassemble and Assemble Lift Section

Hydraulic System TM1859 (14JUL04) 32-3260-21 700H Crawler Dozer 071404 PN=573 Disassemble and Assemble Lift Control Valve Section 1 2 3 4 5 6 7 8 20 19 18 17 15 14 13 12 11 10 9 –UN–18AUG00 15 16 T133072 T133072 1—Check Valve and Spring 6—Ball Cam 11—Centering Spring 16— O-Ring 2—Valve Section Body 7—Cap 12—Spring Seat 17—Screw (2 used) 3—Seal Holder 8—Spool End Screw 13—Ball (4 used) 18—Spool Wiper 4—Detent Sleeve 9—Vent Screen 14—Detent Spring 19—Spool 5—Cap Screw (2 used) 10—Spring Seat 15—Lip Seal (2 used) 20—Retaining Plate IMPORTANT: Spool MUST be installed into the 6. Put clean hydraulic oil on spool and install spool valve housing the same way it was into valve housing.

On spool tang end install seal removed for proper operation of the (15) and wiper ring (18) using JDG734 Seal hydraulic function. Installation Tool. 1. Remove parts (5, 7 and 9). Remove spool (19) from IMPORTANT: Lip seal (15) will be damaged if housing (2). installed over spool end while installed in seal holder (3). 2. Using a protective cover or wooden blocks, put spool in vise. Remove parts (8, and 10—12). 7. On cap end install seal holder (3) over spool end first. Lubricate seal (15) and install over spool end 3. Remove parts (13, 6 and 14). being careful to keep seal perpendicular to spool axis when passing cross drilled holes in the spool. 4. Remove parts (4, 3 15 and 16).

Grease and install detent sleeve (4). 5. Inspect parts for wear or damage. Replace all O-rings and backup rings. Continued on next page CED,TX03399,6082 –19–31MAR00–1/2 32 3260 21