Track System IMPORTANT: Never use an impact wrench to start cap screws in split master link to avoid cross-threading. 01 0130 4. Install new cap screws and nuts. Install new nuts using DFT1041 tool. (See DTF1041 Track Nut Removal Tool in section 99. 30 T96291 –UN–23FEB89 5. Install nuts with rounded edges (A) against link and chamfered edges (B) away from link. 6. Tighten cap screws to the initial torque using a crisscross sequence. Then repeat sequence for the additional turn. Track Shoe Cap Screw: Track Shoe Cap Screw—Specification (5/8 in.)—Torque Turn 163 (120 lb-ft) + 1/3 Turn (120 ° ) ...............................
(5/8 in.) with Swamp Shoe— Torque Turn 163 (120 lb-ft) + 1/2 Turn (180 ° ) ............................................... T96292 –UN–23FEB89 Split Master Link Shoe Cap Screw: Split Master Link Shoe Cap Screw—Specification (5/8 in.)—Torque Turn 163 (120 lb-ft) + 1/2 Turn (180 ° ) ............................... (5/8 in.) with Swamp Shoe— Torque Turn 163 (120 lb-ft) + 1/2 Turn (180 ° ) ............................................... 7. Check torque after 50—100 hours of operation to make sure cap screws are tightened to minimum torque.
T6352AH –UN–23FEB89 Track Shoe Cap Screws 50—100 Hour Check—Specification Track Shoe 50—100 Hour Check—Minimum Torque 380 (280 lb-ft) ............................................ A—Nut Rounded Edges B—Nut Chamfered Edges CED,TX03399,5947 –19–24MAR00–2/2 TM1859 (14JUL04) 01-0130-30 700H Crawler Dozer 071404 PN=80