. OPERATION OPERATION OPERATIONS AND CHECKS AFTER STARTING ENGINE WARNING BREAKING-IN THE MACHINE CAUTION 3 - 94 Emergenc y sto If there is s ome abnormal m ovement or breakdown, turn the k ey in the starting switch t o the OFF position. Always carry o ut of the war ming-up operation thoroughly. If the work eq uipment is operated w control levers perated w hen of t he machine is not properl y w armed up , the re action of the work equipment to the operatio n of the levers will be slow or the work equipment may even move i n a way n ot intende d by the operat or.
In particular, be c aref ul to carry out the w arming operation thoroughly in c old ar This machine has undergone f ull inspec tion and adjustment of al l parts befor e shipment f rom the fa ctory, bu t if the f ull l oad is applied to the machine before a ll parts ha ve been b roken in, there will be adver se effect on th e service l ife and p erformance of the machine. Carr y out the breaking-i n operation for th e first 10 0 hours of the m achine (the standar d tim e on the se rvice m eter).
Pay particular attention to the f ollowing points wh en carrying out the breaking-in operation Run th e engine at lo w idling and carry out the warming-up ope ration for 5 minutes after starting th e engin Avoid a pplying any h eavy lo ad or run ning at hi gh speed durin g operations Avoid s udden startin g, sudd en acceleration, u nnecessary sud den stopping , or sudden changes in directio