Komatsu — WHEN REQUIRED

. MAINTENANCE SERVICE PROCEDURE MAINTENANCE SERVICE PROCEDURE on radiator cap (2) to drain the the 4 - 25 2. release the pr essure before removing 3. plugs (3) and ( 4) of the radiator, and drain the water. 4. After draining t he coolant, close drain plugs (3) and (4), with tap water . 5. When the radi ator is full, start the engi ne, and run it at lo Keep the engi ne running at low idle for 10 minutes un coolant tempe rature reaches more th an 90°C (194°F). 6. 7. Close drain pl ugs (3) and (4). et valve (1) to the ON position to open it. cing the corrosion resistor, see REPLACE CORROSION RESISTOR ixing container and mix it thoroughly. LANT and water, see "Mixing rate of water and COOLANT".

p 9 through the water filler up to the bottom of the filler port. 8. Replace the c orrosion resistor, then s et valve (1) to the ON position For details of the procedure for repla (PAGE 4-53). CARTRIDGE 9. Put the COOL ANT and water into a m ixing container a For details of t he ratio for mixing COO LANT and water, see "Mixing rate of water a 10. Pour the coola nt mixture made in Ste p 9 through the w ater filler up to the bottom of 11. To bleed the a ir from the cooling syst em, run the engin e at low idle for 5 minutes, a nd for a further 5 minutes at high idle. (W hen doing this, leave t he radiator cap off .) 12. Stop the engin e, wait for approx.

3 mi nutes, then add ta p water until the water level i s near the water f iller port, and tighten th e cap. Check the coola nt level and add w ater if necessary.