Komatsu — 23.1 MAINTENANCE SCHEDULE CHART

23.

MAINTENANCE SCHEDULE CHART SERVICE ITEM Check seat belt for wear or damage 3-46 Check for water and sediment in water separator, drain water 3-46 EVERY 50 HOURS SERVICE Drain water, sediment from fuel tank 3-47 EVERY 250 HOURS SERVICE Lubricating 3-48 (Power tilt dozer) l Lift cylinder support yoke (4 places) 3-48 l Lift cylinder support shaft (2 places) 3-48 l Lift cylinder ball joint (2 places) 3-48 l Tilt cylinder ball joint (1 place) 3-48 l Tilt brace ball joint (1 place) 3-48 l Brace ball joint (2 places) 3-48 l Tilt brace thread (1 place) 3-48 (Power tilt power pitch dozer) l Lift cylinder support yoke (4 places) 3-49 l Lift cylinder support shaft (2 places) 3-49 l Lift cylinder ball joint (2 places) 3-49 l Tilt cylinder ball joint (1 place) 3-49 l Pitch cylinder ball joint (1 place) 3-49 l Brace ball joint (2 places) 3-49 (Angledozer) l Lift cylinder support yoke (4 places) 3-50 3-50 l Lift cylinder support shaft (2 places) l Lift cylinder ball joint (2 places) 3-50 l Tilt brace ball joint (2 places) 3-50 l Tilt brace thread (2 places) 3-50 Grease equalizer bar side pin 3-51 Check oil level in final drive case, add oil 3-51 Check oil level in hydraulic tank, add oil 3-52 Change oil in engine oil pan, replace engine oil filter cartridge (D65P, 65EX, PX only) 3-53 3-21