24. SERVICE PROCEDURE 24.6 EVERY 1000 HOURS SERVICE Maintenance for every 50, 250 and 500 hours should be carried out at the same time. 24.6.1 CHANGE OIL IN POWER TRAIN CASE, CLEAN STRAINERS (POWER TRAIN STRAINER, SCAVENGING PUMP STRAINER) A WARNING l The oil is at high temperature immediately after the machine has been operated. Wait for the oil to cool down before starting the operation. l The undercover is heavy. Never try to open or close the cover when directly be- neath it. When removing bolts 0, carry out the work from the rear below the cover so that you can easily get out of the way. Prepare the following. Container to catch drained oil: Min 50 Q capacity Refill capacity:
50 II l l 1. Loosen drain plug 8 (with a slit), drain the oil, then tighten drain plug 8 again. Do not remove drain plug @. 2. Remove the undercover at the bottom rear of the machine as follows. Remove 2 bolts 0 at the front of the machine. Support the cover with your elbow while gradually remov- ing 2 bolts 0 at the rear of the machine. Lower the cover gradually to open it. (1) (2) (31 3. Loosen mounting bolt 0 of the power train strainer, then remove cover 0 +=j 4. Take out spring 0, then take out strainer 8. + Dangerous place fwz 3-64