Operating & maintenance manual 14.1.1 Mounting the pad foot segments on a smooth roller drum Step 1: Dismantling the attached part s of the smooth roller drum Remove the front and rear scrapers ( 4 ) from the smooth roller drum ( 5 ). Make sure the roller frame is securely fastened by appropriate tie-down equipment ( 6 ) before lifting it by means of a crane. The lifting height is sufficient if a pad foot segment can be placed under the smooth roller drum ( 5 ). Prior to starting work, put struts under the roller frame to support it. Use a high pressure washer to clean the smooth roller drum ( 5 ). Step 2:
Mounting the first pad foot segment Use a crane to lift the first segment ( 2 ) at the lifting lug ( 7 ) and to place it onto a transport vehicle at the lifting lugs. Drive the transport vehicle under the smooth roller drum ( 5 ), put down the segment ( 2 ) and adjust its position. Lower the roller frame ( 6 ) by means of the crane and place the smooth roller drum ( 5 ) on the segment ( 2 ). Remove the tie-down equipment. Advance the compaction roller until the smooth roller drum ( 5 ) rests only on the rear edge ( 8 ) of the first segment ( 2 ). 4 5 4 6 Fig. 81 Lifting the roller frame 7 2 5 2 8 Fig.
82 Mounting the first segment 68 NOTICE In order to approach the segment slowly, it may be necessary to overmodulate both the drum and the rear axle (see the respective information in this operating and maintenance manual).