Hitachi Construction Machinery — Fan Pump Flow Rate Measurement

OPERATIONAL PERFORMANCE TEST / Component Test Adjustment of Main Pump Flow Rate Control The flow rate control is performed by signal current (I) of pump control solenoid valve. The flow rate control is adjusted by changing the set-force of spring (1). Adjustment: Loosen nut (2) and turn adjusting screw (3). T16J-04-04-006 NOTE: Change in Flow Rate (Reference) Main Pump 1 Speed: 1803 min -1 Main Pump 2 Speed: 1750 min -1 Adjusting Screw Turn 1/4 Flow Rate Change (Main Pump 1) 38.0 L/min Q Flow Rate Control Flow Rate Change (Main Pump 2) 36.9 L/min 3 I NOTE: I: The signal current of pump control sole- noid valve. Flow Rate Decrease Flow Rate Increase W107-02-05-129 T4-5-19 1 2 3