OPERATIONAL PERFORMANCE TEST / Component Test MAIN RELIEF VALVE SET PRESSURE Summary: Measure the main relief valve set pressure at the de- livery port in main pump. Preparation: 1. Stop the engine. 2. Push the air bleed valve on top of the hydraulic oil tank and release any remaining pressure. 3. Connect Dr. ZX and select the monitoring function. When Dr. ZX is not available, use the pressure gauge. Remove the plug of pressure check port from the main pump delivery port. Install adapter (ST 6069), hose (ST 6943) and pressure gauge (ST 6941). Main Pump 1 Side Plug : 6 mm 4. Start the engine. Confirm that no oil leakage is observed at the pressure gauge connection. 5.
Maintain the hydraulic oil temperature at 50 ± 5 ° C (122 ± 41 ° F). Measurement: 1. Measurement Conditions are below. T1J1-04-05-001 Main Pump 2 Side Plug 2. First, slowly operate the bucket, arm and boom control levers to the stroke end and relieve each function. 3. As for the swing function, secure the upperstruc- ture so it is immovable. Slowly operate the swing lever and relieve the swing function. 4. As for the travel function, secure the tracks against an immovable object. Slowly operate the travel levers and relieve the travel function. 5.
With the power digging switch pushed, slowly op- erate the bucket, arm and boom control levers to the stroke ends and relieve each function within eight seconds. Evaluation: Refer to the Operational Performance Standard in Group T4-2. T1J1-04-05-002 NOTE: If the measure pressures for all functions are lower than the specified range, the probable cause is a decrease of main relief valve setting pressure. If relief pressure of a particular function is lower, the probable cause is other than main relief valve. T4-5-8 Engine Control Dial Power Mode Switch Auto-Idle Switch Work Mode Fast Idle HP Mode OFF Digging Mode