Hitachi Construction Machinery — Fan Pump Delivery Pressure

OPERATIONAL PERFORMANCE TEST / Component Test FAN PUMP DELIVERY PRESSURE Preparation: 1. Stop the engine. 2. Push the air bleed valve on top of the hydraulic oil tank and release any remaining pressure. 3. Remove the plug of pressure check port from the fun pump delivery port. Install adapter (ST 6069), hose (ST 6943) and pressure gauge (ST 6941). : 6 mm 4. Start the engine. Confirm that no oil leakage is observed at the pressure gauge connection. 5. Maintain the hydraulic oil temperature at 50 ± 5 ° C (122 ± 41 ° F). Measurement: 1. Measurement Conditions are below. Engine Control Dial Work Mode Plug Fast Idle Digging Mode 2.

Measure pressure with the control levers in neu- tral without load. 3. Repeat the measurement three times and calcu- late the average values. Evaluation: Refer to the Operational Performance Standard in Group T4-2. Remedy: Refer to the Troubleshooting B in Group T5-7. T1J1-04-05-003 Fan Pump T4-5-7 Power Mode Switch Auto-Idle Switch HP Mode OFF