. OPERATION TRANSPORTATION OPERATION TRANSPORTATION NOTICE then lift hook 3 - 184 6. Pas s wire rop es between t he 1 st and 2nd track rollers from t he fron t and betw een the 1 st and 2nd track rollers from t he rear. 7. Put blocks be tween the wire r ope and th e machine to prevent damage to the rope or machin Do n ot attempt to lift up the machine b y hanging a wire rope to th e bracket that is p rovided fo r fastenin g t achine transportation practice will damage the machine 8. Set the lifting angle (A) of the wire rope to 30 ° to 40°, the machine s 9. Afte r the ma chine come condition and the lifting postur e, and the n lift