38 7 Load handling – 7.8 Levelling D 1 + 2 D790-1 D 3 D797-R D791-3 D791-2 7 D D 9 8 C 13 P1 A 4 T1 10 11 12 B 5 C 6 004867 1. Control lever (S815-P1 and S815-T4) 8. Solenoid valve levelling (Y6034) 2. Control unit cab (D790-1) 9. Servo valve levelling right (Y6035) or Servo valve lev- elling left (Y6036) 3. Control unit frame rear (D797-R) 10. Control valve attachment 4. Solenoid valve, engagement of hydraulics for top lift (Y6003) 11. Over-centre valve 5. Shuttle valve 12. Valve block levelling cylinder 6. Hydraulic oil pump 13. Levelling cylinder 7.
Control unit attachment option (D791-2) or Control unit attachment left legs (D791-3) Hydraulic diagram combi attachment Hydraulic diagram top lift, tilt lock, controllable tilt and hydraulic lev- elling UDRF01.04GB Maintenance manual DRF 400–450