PIPER COMANCHE SERVICE MANUAL IG2 SURFACE CONTROLS REVISED: 4/10/81 FIGURE 5-2. AILERON CONTROL INSTALLATION 2113 5 ,.....-.v. ... 11III .... __ IIUD01I1 •A1~U'" INTIIIClDfMCT 1. BELL.CRANK, LEFT 2. PULLEY S. CONTROLCABLE,LEFT •. BALANCE CABLE 5. BELLCRANK, RIGHT I. CONTROL CABLE, RIGHT 7. STRAP "ITTING •• BOLT ASSEMBLY t. LOCKNUT 10. ADJUSTMENT BOLT 11. STOP BLOCK 12. END BEARING, CONTROL ROD U. CONTROL ROD U. PIVOT BOLT ASSEM8LY 15. ROD, CABLE GUARD U. SWAOGED 8ALL "ITTINO 17. TURNBUCKLE 11. sPRING 11. INTERCONNECT SPRING A830 12 3 13 4 9 10 1 11 8 SKETCH A