PIPER COMANCHE SERVICE MANUAL I. CO"'I'''OI. C"'101 ,,'I'''''CIO .... '''I' ,01oT 1. "U11 I~ .." J Io.e ...... 'YOT 1010T CIOICIlI"1 TOOl. AlII 2 3 2 o e o o o o e o I. la.L.CltAllll ITO" ILOCll L 'TW .IoT Ia.&.CIlMC 4. COli,...&. c.a.U 'l'VltlllUCIliI.I 4 FIGURE &-3. INSTA1.UnON Of 8ELLCRANK CHECKING TOOL fleURE W. AILERON ADJUSTING POINTS 6. If the forward control cables ill die NIc1Ite 1ft iIlmUcd. COIlMCt die strap fitti.al (7) of the cables at statiOD 126.5 ... bolt. nut: and comr piD. 1. From the pulley duster within me fasellp at scarion 11.5 .0, draw the primuy cable forwud through the floor support: bulkheads.
Under the pulley dURer at lUCion 50.0 and up to the vertical sprocket chain. Co lnsu.llarion of me left and/or rilht prim.". control cable(s) witbin me fuIelace may be. &ccomplilhcd by the followinl procedure: CAtn10N Whm striap.n, the cabla OD the from pulley duaer jQ.ft aft of 6ft wall, be sure to thrad cable in the puDey IfOOW and not OWl' tOP of either the front Of bottom cable pvds. (Refer to View A·A of Fipre S-Z.) Z. Connect the cable with aambuck1e to the Ymic:al chaift UIiDt devis bolt:, bushint. nut .. ~:1 COtter pin. 3. CoMCC't the fuelace primu'y cable with the win, primary cablc by UK of bolt, washer and nut throuJb a shackle at fuclqc station 1%6.5. 4.
Replace the cable pard (15) at thc paDcy cluRcr aft of me rar spar ud the two cable I'W'ds at the pulley cluster at surion 50.0, safcry the pU'dI. ci. Set cable tCftJion per Table V-I. check riaiDI and adjusanCllt per """"'h 5·11 and ucerta.in that all tumbuck1cs are saieticd. c. Install access plates aDdpmcls, carpets. sat tracks and sella. SURFACE CONTROLS ISSUED: 8118n2 IG4