BAIC — BAIC Comanche Service Manual: Comprehensive Guide for PA-24 Series Aircraft

PIPER COMANCHE SERVICE MANt:AL g. h. pressure. Rotate fuel selector to check for smooth operation and to insure proper seating in detent POSitiO. Before reinstalling the valve, it should be checked for leaks and correct operation using 50 PSI ~OTE If valve is submerged in water for test. insure all water is removed. I. After reinstallation of valve, check operation and for fuel leaks. 8·15. Sen-icing Five Position Fuel Valve (Hoof). (PA-24-250 and PA-24-260) ~ormally the five position valve need only be serviced when there are indications of binding or leakage around the valve shaft (I. Figure 8- I 2).

at the mating surface of the upper valve body (10) and lower valve body (6) or if reason to believe that there is leakage through the valve when in an off position, Replacement of "0" rings will usuallv correct this condition. a', With the valve assembly removed from the aircraft. remove the safety wire and disassemble the valve assernblv. b. Check the shaft hole of the va he body (10) where the "0" ring (2) makes contacts for roughness that might damage the "0" ring. Polish the hole surface to remove any roughness. INTENTIONALLY LEFT BLANK REVISED: 11/1/82 2J4 Fl.'EL S)·5T.