Komatsu — REMOVAL

DISASSEMBLY AND ASSEMBLY ENGINE 16. Sling condenser assembly (22) and remove the mounting bolts and condenser assembly. a Remove the condenser assembly and reser- voir tank together. 19. Remove wiring harness clamp (27) under the power train line filter assembly bracket, and then remove the wiring harness. 20. Remove 4 mounting bolts (28) of the power train line filter assembly, and then remove the power train line filter assembly. 4 Power train line filter assembly: 23 kg 17. Remove universal joint assembly (23). [*2] 21. Remove power train line filter assembly bracket (29). 18. Disconnect 2 pipes (25) and (26) of power train line filter assembly (24).

a Cover the disconnected flanges to prevent foreign matter from entering them. 22. Remove the 2 mounting bolts of front engine mounts (30) and (31). D85EX-15 30-45 (2)