DISASSEMBLY AND ASSEMBLY ENGINE 23. Remove the 2 mounting bolts of rear engine mounts (32) and (33). INSTALLATION Carry out installation in the reverse order to removal. a For the method of changing the fuel injection amount adjustment after the engine assem- bly or engine controller is replaced, ask your Komatsu distributor. [*1] Length of spacer: L = 108.5 mm (2 pieces) [*2] 3 Mounting bolt: 98.1 – 122.6 Nm {10 – 12.5 kgm} 24. Lift off engine assembly (34). a Before lifting off the engine assembly, check that all the wires and pipes are disconnected. Refilling with water Add water through the water filler to the specified level. Run the engine to circulate the water through the system.
Then, check the water level again. 4 Engine assembly: 1,390 kg 5 Cooling water: Approx. 80 l Charging air conditioner with refrigerant gas Using tool X2 , charge the air conditioner circuit with new Freon gas (R134a). 30-46 D85EX-15 (2)