Komatsu — REMOVAL

DISASSEMBLY AND ASSEMBLY WORK EQUIPMENT CONTROL VALVE 9. Disconnect the left PPC hoses. [*2] (15): Ripper lift cylinder LOWER hose cou- pler (Port B4) • Color band: None (16): Blade lift cylinder RAISE hose coupler (Port B3) • Color band: None (17): Blade tilt cylinder RIGHT tilt hose cou- pler (Port B2) • Color band: Green 10. Disconnect hose (18) for the left of the HSS (Port PB1). 14. Disconnect LS hose (29). 11. Disconnect the following 8 work equipment hoses. (19): Ripper lift RAISE hose (Port A4) (20): Ripper lift LOWER hose (Port B4) (21): Blade lift RAISE hose (Port A3) (22): Blade lift LOWER hose (Port B3) (23): Blade tilt RIGHT hose (Port A2) (24):

Blade tilt LEFT hose (Port B2) (25): HSS motor LEFT hose (Port A1) (26): HSS motor RIGHT hose (Port B1) 15. Remove 4 work equipment control valve mount- ing bolts (30). 12. Disconnect drain hose (27). 13. Disconnect main hose (28). D85EX-15 30-175 (2)