DISASSEMBLY AND ASSEMBLY WORK EQUIPMENT CONTROL VALVE 16. Lift off work equipment control valve assembly (31). 4 Work equipment control valve assembly: 125 kg Refilling with oil Add oil through the oil filler to the specified level. Run the engine to circulate the oil through the system. Then, check the oil level again. INSTALLATION 5 Hydraulic tank: D85EX-15; Approx. 150 l D85PX-15; Approx. 140 l Carry out installation in the reverse order to removal. Bleeding air Bleed air from the piping. For details, see TEST- ING AND ADJUSTING, Bleeding air from work equipment cylinders. [*1] [*2] The connecting positions of the PPC hoses are indicated by their band colors.
When installing them, check their band colors.
a Positions of PPC ports of work equipment control valve assembly PA4 (Ripper lift cylinder RAISE port) PA3 (Blade lift cylinder LOWER port) PA2 (Blade tilt cylinder LEFT tilt port) PA1 (Port for right of HSS) PB4 (Ripper lift cylinder LOWER port) PB3 (Blade lift cylinder RAISE port) PB2 (Blade tilt cylinder RIGHT tilt port) PB1 (Port for left of HSS) a Positions of ports of work equipment control valve assembly A4 (Ripper lift RAISE port) B4 (Ripper lift LOWER port) A3 (Blade lift LOWER and FLOAT port) B3 (Blade lift RAISE port) A2 (Blade tilt LEFT port) B2 (Blade tilt RIGHT port) A1 (HSS motor RIGHT port) B1 (HSS motor LEFT port) TS (Drain port) P1 (Main port) LS (LS port) 30-176 D85EX-15 (2)